software-engineering-mcqs - Set (1)

Correct Answer: Orange && Worng Answer: Red

1. Which of the following is black box testing?

  • (A). Basic path testing
  • (B). Boundary value analysis
  • (C). Code path analysis
  • (D). None of these
  • View Answer

    Explanation: Boundary value analysis is used in case design technique for black box testing.

    2. How is software reliability defined?

  • (A). Time
  • (B). Efficiency
  • (C). Quality
  • (D). Speed
  • View Answer

    Explanation: Software Reliability mainly concerned with the time component. Execution time of any sotware defined in software reliability.

    3. Identify the disadvantage of spiral model

  • (A). Doesn’t work well for smaller projects
  • (B). High amount of risk analysis
  • (C). Strong approval and documentation control
  • (D). Additional functionality can be added at a later date
  • View Answer

    Explanation: All other options are the advantages of Spiral Model.

    4. The testing in which code is checked

  • (A). Black box testing
  • (B). White box testing
  • (C). Red box testing
  • (D). Green box testing
  • View Answer

    Explanation: In white box testing internal component of software which means back end of software is checked.

    5. Which model can be selected if user is involved in all the phases of SDLC?

  • (A). Water fall model
  • (B). Prototyping model
  • (C). RAD model
  • (D). Both (A) and (B)
  • View Answer

    Explanation: Not Avilable

    6. What kind of quality cost is incurred when an error is detected in a product prior to shipment?

  • (A). Prevention
  • (B). Internal failure
  • (C). External failure
  • (D). Appraisal
  • View Answer

    Explanation: This includes rework, repair, and failure mode analysis.

    7. Which of the following is a requirement management activity?

  • (A). Investigation
  • (B). Design
  • (C). Construction and Test
  • (D). All of the mentioned
  • View Answer

    Explanation: Not Avilable

    8. The process of each manager follows during the life of project is known as-

  • (A). Project Management
  • (B). Manager life cycle
  • (C). Project Management Life Cycle
  • (D). All of the mentioned
  • View Answer

    Explanation: Not Avilable

    9. The degree to which the design specification are followed during manufacturing is known as-

  • (A). Quality of design
  • (B). Quality of conformance
  • (C). Quality of testing
  • (D). None of the mentioned
  • View Answer

    Explanation: Not Avilable

    10. Which is not the types of prototype model?

  • (A). Horizontal Prototype
  • (B). Vertical Prototype
  • (C). Diagonal Prototype
  • (D). Domain Prototype
  • View Answer

    Explanation: Their is no such thing as Diagonal Prototype whereas other options have their respective definitions.

    11. COCOMO model is use for-

  • (A). Hardware Design
  • (B). Data flow design
  • (C). Software cost estimation
  • (D). Hardware cost estimation
  • View Answer

    Explanation: COCOMO model used in software estimation model.

    12. What is DFD ?

  • (A). The modern version of flow chart
  • (B). Mainly used at system specification stage
  • (C). The primary output of the system design phase
  • (D). All of the above
  • View Answer

    Explanation: Not Avilable

    13. Most creative and challenging phase of system life cycle is-

  • (A). Feasibility study
  • (B). Maintenance
  • (C). Design
  • (D). None of these
  • View Answer

    Explanation: System design is the most creative and challengiing phase of SDLC.

    14. Expantion of SRS is-

  • (A). Software Requirement Specification
  • (B). Software Resource Specification
  • (C). Software Recycle System
  • (D). None of these
  • View Answer

    Explanation: Not Avilable

    15. Decision support systems are used to-

  • (A). Evaluate and analyze the mission of organization
  • (B). Perform multiple activies simultaneously
  • (C). To perform accounting
  • (D). None of the above
  • View Answer

    Explanation: Not Avilable

    16. A starting point in the design phase of a system design project is-

  • (A). Bench marking
  • (B). Preparation of purchase contract
  • (C). The determinaation requirements or hardware
  • (D). Calling quotaion form hardware
  • View Answer

    Explanation: Not Avilable

    17. Cost of error correction is least at-

  • (A). Implementation stage
  • (B). Design stage
  • (C). Development stage
  • (D). Requirement analysis stage
  • View Answer

    Explanation: Not Avilable

    18. Prototype is a-

  • (A). Working model of existing system
  • (B). Mini model of existing system
  • (C). Mini model of processed system
  • (D). None of the above
  • View Answer

    Explanation: Prototype is a working model of existing system.

    19. The goal of modularization can be said to be-

  • (A). Produce systems that have stamp or data coupling between models
  • (B). Control and content coupling between models
  • (C). Control and data coupling between models
  • (D). Common and stamp coupling between models
  • View Answer

    Explanation: Not Avilable

    20. LOC in context to software engineering-

  • (A). Linear OP code
  • (B). Line of code
  • (C). Line of control
  • (D). None of these
  • View Answer

    Explanation: Not Avilable